Temporary Closure: Clubhouse Main Pool Replastering and Maintenance
Dear Valued Residents,
We are writing to inform you of the temporary closure of the main pool located near the Clubhouse.
The work is scheduled to begin Monday, November 16, 2026 and is expected to be completed by Friday, January 29, 2027, barring delays. The construction hours will be Monday through Friday from 8:00 AM - 5:00 PM.
The replastering of the swimming pool will include, but is not limited to drilling, generator operation, jack hammering, and increased dust presence. Upon completion of the replastering, a stabilization period will be required to ensure that pool levels are properly balanced.
The restrooms, spa, and fitness facility will continue to be available for use. Parking spaces along Oak Creek Drive may be blocked off for use by the contractor. Please be mindful of alternate pathway routes while navigating these areas.
Thank you for your attention and for your cooperation during this period. If you have any questions or concerns, please contact Resident Services at here.
Sincerely,
The Management Team at Oak Creek